Important company events

Casing rotation during running and casing rotation during cementing during well construction in the Salmanovskoye (Utrenneye) field (2747 m.)
177.8 mm in diameter to a depth of 2747 m
More details ...
Casing rotation during running and casing rotation during cementing during well construction in the Yuzhno-Tambejskoe field (2071 m.)
177.8 mm in diameter to a depth of 2071 m
More details ...
Casing rotation during running and casing rotation during cementing during well construction in the Yuzhno-Tambejskoe field (2033 m.)
177.8 mm in diameter to a depth of 2033 m
More details ...
Casing rotation during running and casing rotation during cementing during well construction in the Yuzhno-Tambejskoe field ( 1851 м.)
177.8 mm in diameter to a depth of 1851 m
More details ...
Casing rotation during running and casing rotation during cementing during well construction in the Salmanovskoye (Utrenneye) field (2989 m.)
177.8 mm in diameter to a depth of 2989 m
More details ...
Casing rotation during running and casing rotation during cementing during well construction in the Yuzhno-Tambejskoe field (2494.52 м.)
177.8 mm in diameter to a depth of 2494.52 m
More details ...
Casing rotation during running and casing rotation during cementing during well construction in the Salmanovskoye (Utrenneye) field (2163 m.)
177.8 mm in diameter to a depth of 2163 m
More details ...
Casing string lowering at the Yuzhno-Tambejskoe field (2520 m.)
177.8 mm in diameter to a depth of 2520 m
More details ...
Casing rotation during running and casing rotation during cementing during well construction in the Yuzhno-Tambejskoe field (2283 m.)
177.8 mm in diameter to a depth of 2283 m
More details ...
Casing string lowering at the Yuzhno-Tambejskoe field (2155 m.)
177.8 mm in diameter to a depth of 2155 m
More details ...
Casing string lowering at the Yuzhno-Tambejskoe field
177.8 mm in diameter to a depth of 1345 m
More details ...
Casing string lowering at the Vostochno-Tarkosalynskoe field
177.8 mm in diameter to a depth of 3924 m
More details ...
Casing string lowering at the Urengoiskoe OGCF
177.8 mm in diameter to a depth of 3931.23 m
More details ...
Casing string lowering at the Vostochno-Tazovskoye field
177.8 mm in diameter to a depth of 3927 m
More details ...
Oil refinery processing contract with “SMOLNEFT” Refinery
Signing a contract for oil refining at the “SMOLNEFT” Refinery in the Smolensk region
More details ...
Contract with the Purovsky Oil Refinery (YNAO) for oil products processing
Signing of a contract for oil processing at the Purovsky Oil Refinery (YNAO)
More details ...
Casing string lowering at the Pestsovskoe OGCF
177.8 mm in diameter to a depth of 3725 m
More details ...
Casing string lowering at the North-Urengoy OGCF
177.8 mm in diameter to a depth of 3846.84