Casing rotation during running and casing rotation during cementing during well construction in the Salmanovskoye (Utrenneye) field (2747 m.)

23 november 2020
We have lowered and cemented the casing string with rotation 177.8 mm in diameter to a depth of 2747 m. at the Salmanovskoye (Utrenneye) field
Drilling contractor: Investgeoservis JSC
General customer: JSC Arctic LNG 2
Deposit name: Salmanovskoye (Utrenneye) field, well cluster No.1, wellsite No.107
Diameter: 177.8 mm
Depth: 2747 m